Highway corridor work and noise-wall projects
Two major highways bracket West Slope, and the corridor carries paving, drainage and sound-wall projects that run for months. Crews on those West Slope contracts keep a unit at the staging pull-off behind the barrier rather than anywhere near live traffic.
Access to a West Slope work zone changes week to week as the closure pattern shifts. We confirm the current entry with the traffic control lead before each service visit, which is safer for our driver and less disruptive for the West Slope crew.
Hillside houses and driveway footing
Homes across West Slope sit on a continuous grade, and many driveways drop sharply from the street to a garage below. A West Slope placement goes up at street level on the flat, because a unit set below the house is unreachable once winter rain slicks the concrete.
Soil under West Slope is clay that holds water and slides on a slope when saturated. Long-running West Slope projects therefore sit on pavement or a plate, which keeps the unit level and keeps our truck on a surface with grip.
Community buildings, schools and small events
The library and the school grounds give West Slope its gathering places, hosting book sales, fairs and small community events. Those West Slope bookings take one or two units on the paved lot with an accessible unit near the door and a handwashing station when food is served.
Summer building and grounds projects at the West Slope schools run on the usual tight break schedule. Units stay inside the fenced work area for those West Slope jobs and get a weekly service day that finishes before staff come back.
