School grounds, sports fields and summer projects
North Clackamas district buildings and playfields sit at the center of Sunnyside, and the heavy work happens the moment the school year ends. A Sunnyside field renovation or roof replacement holds units from late June into August, placed on asphalt where staff parking is already fenced off.
Weekend tournaments fill the Sunnyside fields through spring and fall with visiting teams and no open buildings. Those Sunnyside bookings take two to four units near the parking entrance with a handwashing station, delivered Friday and pulled Monday.
Congregations and the weekend calendar
Several large congregations meet along the Sunnyside Road corridor, and their festivals, car shows and outdoor services regularly outgrow the building. A Sunnyside church booking usually means four to eight units on the parking lot, sited so the rows people actually use stay open.
Volunteer building projects are the other half of this work, since a Sunnyside congregation will often run its own remodel over a summer. Those Sunnyside placements stay for weeks and get a standing service day rather than a call each time.
Driveway remodels and the hillside edge
Housing in Sunnyside dates mostly to the 1970s through the 1990s, which means the current work is kitchens, additions, siding and re-roofs rather than new lots. A Sunnyside remodel takes one standard unit at the curb end of the driveway, sharing space with the dumpster and the material drop.
Toward Mount Talbert the Sunnyside streets start to pitch, and a wet winter turns those grades slick. We set units on the level apron near the street on those Sunnyside lots so a driver is never backing up down a pitched, rain-slicked drive.
