Swan Island, the slough and heavy industry
Swan Island and the north harbor keep this part of the peninsula working, with shipyard maintenance, truck plants and freight terminals running shifts around the clock. Industrial placements in north harbor yards go inside the fence on slab, well clear of the lanes where trailers and yard tractors swing.
Contractors along the Columbia Slough on the north edge deal with fill ground, old pavement and tight setbacks against the water. We set north-side units on the firmest surface available and keep them back from the slough bank, which is softer than it looks in any season.
Bluff houses, St Johns and older streets
The residential streets north of the harbor run from prewar bungalows to bluff-top houses with views over the shipping channel. A north-side remodel usually gets one standard unit at the curb, and we confirm clearance because the parking lanes here are narrow and parked solid.
St Johns and the blocks north of the bridge have their own main-street rhythm of storefront remodels, festivals and volunteer clean-ups. Those north-end jobs take single units placed at the alley or the barricade line rather than on the busy pavement.
Delta Park, the raceway and event weekends
Delta Park and the raceway give the north peninsula the largest event footprint in the city, from soccer tournaments to race weekends and charity runs. Those north-side bookings take banks on the paved lots, an ADA accessible unit at each entrance and handwashing stations near the food vendors.
Ground at the north end of the peninsula is low, flat and slow to drain after a wet stretch. Event placements on the north lots stay on asphalt and gravel so nothing settles into soft turf during a busy weekend.
